The weather was good this week, and I didn’t expect that to keep up, so I decided I’d better get the outdoor shots I wanted. Wednesday I signed out a Scoopic from Yvonne Abusow at the CSIF and then I was committed. I had a hectic couple of days. I wanted shots of the various… Read Article →
Latest Posts Under: Contingency
A problem I run into all the time is that I spread myself too thin over many different projects. I find myself jumping back and forth between each project. In the end, I never finish any of them. It is only when I take a step back; consider each of my projects, and then make… Read Article →
I made progress on several of my projects this week. $100 Film Festival Film I got the test roll for my new $100 Film Festival Film (HDFFF2012). I was happy with how good it looked. I had been worried that the film was too old and wouldn’t work. I need to plan out what to… Read Article →
After substantial procrastination, I’ve taken a break from my transportation planning stories to work on my short film for the 20th annual $100 Film Festival. Wednesday I picked up a camera (a Canon Scoopic) from the CSIF’s new production coordinator Yvonne. It’s been a while since I used a 16mm camera, so I had to… Read Article →
The Crying Woman I had one very productive day on The Crying Woman this week. The whole story should run about 6,000 words and I wrote 2,600 in one session. I have another 2,000 to do. I was optimistic that I could finish it off the next day but I got stuck. Before I started… Read Article →
The Crying Woman I did a little writing on The Crying Woman this week. I’m about a quarter of the way through the first draft. I haven’t really filled in the outline yet. I have done most of the easy stuff. My original plan was for a film similar to Before Sunrise. I’ve decided to… Read Article →